Eneco Leiding over Noord

The new heating season started at Eneco on 1st October 2014. Approximately 95.000 homes and businesses are relying on (sustainable) heat from the Leiding over Noord project. Its construction was still in full swing before this time, but the supply of heat was continued.
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord
Eneco Leiding over Noord

The new heating season started at Eneco on 1st October 2014. Approximately 95.000 homes and businesses are relying on (sustainable) heat from the Leiding over Noord project. Its construction was still in full swing before this time, but the supply of heat was continued.

A temporary gas-fired power station has been constructed as part of the Leiding over Noord project, in case Eneco had to deal with any unforeseen circumstances or delays. This was referred to as a ‘fall back system’. Six large hot water boilers with a total capacity of 70 MW could organise the production of sufficient heat, if this proved necessary.

The six rental boilers were supplied by Kuiper and sons and transported from Ede to Rotterdam with the use of special transport. The boilers were collected from Rotterdam again at the end of the project, on 30th March 2015 and used for our new rental projects.

Please watch the following short film to gain an impression of the Leiding over Noord project.